Experiments In Motion Blog

The Curator's Blog

9/7/2012
["1","2"]

Installation In Motion

In order to install the Experiments In Motion model, the construction team headed by Art Domantay built out this incredible moving rig allowing the model to be worked on at any desired height before it is raised up to its hanging positon and the table is removed. The installation is slated to be open to the public on Sept 15th at the Old Essex Market (corner of Broome and Essex).

 

Comments

154 Notes
  1. clarusmentis reblogged this from architizer
  2. whenhewastwentytwo reblogged this from architizer
  3. n0stalgicfuture reblogged this from experimentsinmotion
  4. postcelebration reblogged this from architizer
  5. ferroso reblogged this from deadheadingcrew
  6. too-blind-to-see-it reblogged this from futurepredictor
  7. supruben reblogged this from experimentsinmotion
  8. anonymisslulz reblogged this from daretolovedistance
  9. inanotherlaifbroda reblogged this from n-architektur
  10. xtesimeravrio reblogged this from n-architektur
  11. rubyshimmer reblogged this from demilovatoeyebrows
  12. demilovatoeyebrows reblogged this from n-architektur
  13. alwaysinstudio reblogged this from n-architektur
  14. n-architektur reblogged this from architizer
  15. fractionalrabbits reblogged this from theresultsofprocrastination
  16. fukakai reblogged this from architizer
  17. passionated reblogged this from experimentsinmotion
  18. daretolovedistance reblogged this from architizer
  19. erniercastro reblogged this from architizer
  20. eikonodoulos-askesis reblogged this from architizer
  21. designplusdigital reblogged this from architizer and added:
    Installation In Motion In order to install the Experiments In Motion model, the construction team built out this...
  22. blackcatdreams reblogged this from architizer
  23. nanomono reblogged this from architizer
  24. aristoalexioskazuki reblogged this from architizer
  25. elcontexto reblogged this from architizer and added:
    Installation In Motion In order to install the Experiments In Motion model, the construction team built out this...